Dongguan Xingan Electronic Co., Ltd.
Xiamen Xingan Electronic Co., Ltd. was established in Xiamen City
in 1998. We specially produce silicone rubber products (such as
imd, keypad, silicone rubber element, and silicone ring).
In 2004, we established Dongguan Xingan Electronic Co., Ltd. in
Dongguan.
In 2005, we established Xiamen Jinming Technology Electronic Co.,
Ltd. in Xiamen.
We specially design and produce metal dome (metal dome array, dome
sheet array, lgf metal dome array, el metal dome array, and
conductive piece).
Company Instruction:
1. 200-300 workers
2. Production capacity of 3,000,000pcs/month.
3. One automatic production line and two semi-automatic production
lines.
Advantages:
1. 10-20 R&D staff with over 4-year experience will coordinate
with customers well on development and production.
2. In possession of a good overseas supply network with
advantageous in cost control.
3. To finish hand sample in one day and to open out the mould for
production in 3 days.
4. Strict execution of ISO9001:2008 quality control system.
Object:
1. To be one of best OEM providers, satisfy customers with our
great efforts and success.
2. Constant creation, pursue quickness and efficiency, focus on
customer's creation.
3. Excellent management. Base on fact decision and business
management.
4. Our good faith is honest. To establish trustful and responsible
interpersonal relationship, improve the ability of production and
control.
Technology Development:
1. Our develop engineers have over 5-year experience in this
industry. They directly participate customer's early period
development design and provide mature and reliable engineering
design plan for customers. For EL technology we directly obtain
support from EL senior manufacturer in South Korea who will assists
customers at the early period of development & design of el
& metal dome.
2. Sample delivery time: 1-2 days after the receipt of blueprint
for delivering general type of metal dome foil; 2-3 days after
receipt of blueprint for delivering emi/esd printing metal
dome.
3. Mould-opening time: 6 days for common metal dome and 12 days for
el & metal dome.
Project Ability:
1. Deviation: dome to dome is /- 0.1mm, hole to dome is /-0.1mm,
size deviation is /- 0.1mm, and hole to hole is /- 0.05mm.
2. Frequency: assembly dome life can reach 1000,000 times and bare
dome life can reach over 2,000,000 times.
3. To choose different specification domes according to customer's
demands, to meet feeling requirements.
4. Our design adopts 3dp/4dp/5dp/6dp, which is specialized for
overcoming bad break over problems caused by the impurity greasy
dirt.
5. We have ability to design & produce metal dome sheet (reel
type).
6. To cooperate with customers in advance, supply stable &
reliable design program and strict quality control.
7. Also we have QC & QA with quality senses in this industry
for 2-5 years. We manage company strictly according to
ISO9001:2000.
Delivery Time
1. For the first time bulk production within 3-4 days for common
metal dome, then just need 2-3 days for later orders.
2. El metal dome: for the first order we need 20-24 days to finish
the bulk production of South Korea EL. Native EL metal dome needs
7-10 days after having the production model. Production capability:
2000,000 per month for main key and 3000,000 per month for side
key.
3.Remark:Above time bases on EXW factory.
Facilities:
We have about 1800sqm standard production base and no dust workroom
with the newest production & detect facilities. We have 8
production lines, with 400000pcs/month output accordingly.
Dongguan Xingan Electronic Co., Ltd.