Send Inquiry
Description:
-size: 16px;">
Installationinstruction
- Edge boards shall be installed levelly at the.
- Light stee keel frames shall be installed with proper intervalsand leveled.
- Main keel of the baking-finished T-keels shall be installedbeneath the light steel keels, auxiliary keels shall be installedand then level.
- ceiling plates shall be placed into the squares
- panels gloves must be worn when installation, if they leavefingerprints or besmirch, usable clearner water cleaning is wipeddry can


