Description:
refining of crude palm kernel oil1.crude palm oil machine
2.teatment:1-1000T/D
3.1grade refined palm oil
4.CE&ISO
2013 automatic refining of crude palmkernel oilmachine
Specifications: 10T/H,30T/H, 45T/H, 60T/H, 80T/H, 100T/H(TON/HOUR);
Craftflow:
1.palmfruit/bunch → sterilization →threshing → digesting → clarification→ purification →dring → CPO
→ refining→ decolorizing → deodorizing →RBD palm oil →crystallization → fractionation → RBD olein &RBD stearin
2.palm kernel →depericarper → crushing → pressing → CPKO → refining → RBDPK oil , RBDPK olein & RBDPKstearin
After collecting byloading ramp, the palm fruit will be transport into sterilizer, andthen the fruit and bunch will be separated by the thresher. Thebunch will be returned into Palm Tree Plant as fertilizer, and thefruit will be pressed by screw press. After pressing, the kerneland fiber impurities can be produced by further separation from theextracts. After drying, the kernel make palm kernel oil, theseparated fiber and shell are the boiler fuel for providing steam.The crude palm oil can be produced by the pressed oil which hasbeen purified. This crude palm oil can be directly sold or deeplymachining. The industrial wastewater will be sent into effluentpond when the oil has been separated. After disposing the sewage,the residual sullages can be used as the fertilizer of palm tree.The advantages of whole process are short period, high automationextent, protecting environment and saving energy.
Henan HuataiCereals&Oil Machinery Engineering Co., Ltd won"TOP 10 Cereals&OilMachinery Brand in China" in 2011, which is the biggest professionalmanufacturer in set of oil machine for 22 years.
Expanding andExtraction Patent No.:ZL200720092291.7;Refinery PatentNo.:ZL200820238863.2
Quality and Service Commitment | |
Our company always put the interests of customers and product quality to the first place, and always adhere to the"no best,only better" as our purpose. We will be commitment to provide high quality products with perfect site services and after-sales service. Now the specific commitments areas follows: | |
1. | Ensure to timely provide complete sets of equipment and accessories. |
2. | Ensure that one-time installation debugging acceptance. |
3. | To provide high quality material with preferential price. |
4. | Priority to provide customer our new craftworks and products. |
5. | Free training technological operator to ensure the trained staff can operationindependently. |
6. | In the installation process,we will appoint a installation supervision staff on the spot. |
7. | we will offer an experienced project manager, organize a good installation team for the work of field installation debugging. |
8. | After the equipment field assembly and installation, we will be also responsible for the single equipment debugging, online debugging and Feeding trial operation,to ensure that equipments can normal operate in full load conditions. We will provide all kinds of information and records according to the requirements of the bid. The qualified completion files will be provided to customers according to their requirements within one month after acceptance. |
9. | In the warranty period, all because of the quality of products has caused the damage or failure of equipment, suppliers will take theresponsibility for the free repair and replacing spare part. Due to the damage caused by the customer,we only charge material costs for repair and replacement. After the receipt of customers notice,we will suggests the method to solve problem within six hours, or send specialist to the site to solve the problem within twenty four hours. |
Customer Visit