Brand:ZHENGXING
MOQ:1
Quantity:1
(1) working environment: - 20 °C ~ 60 °C
(2) working environment humidity: 95% or less (45 °C)
(3) power supply voltage: ~ 220 v
(4) mode: continuous
(5) system comprehensive error: acuities plus or minus 5%
6 weighing sensor repeatability error: acuities plus or minus0.3%
7 weighing sensor nonlinear error: acuities plus or minus 0.3%
7 when power automatic save the current all data, restoreelectricity immediate recovery.
9 sound-light alarm/alarm, two way relay output.
10. has black box function.
Three language:
Chinese
Russian
English
monitoring equipment of tower crane
illa and so on.The ordinary compoment are steeled frame , EPS sandwich panelfor door, wall and roof, plastic steel windows
We can provide varied size for per customer’s need
The advantage of the house is stand 10-level wind and and 7level earthquake, easy to install, quick assemble anddisassemble , convinient transportation.
Temporary building
| FOB Port | Shanghai |
|---|---|
| Loading Info | by sea |
| Packing Info | one piece into one carton |
| Target Market(s) | Africa, Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan &Korea, Latin America, Mainland China, Middle East, North America,Northern Europe, Oceania, South Asia, Southeast Asia, WesternEurope |
4 level heavy duty chrome shelf with good quality
p align= center >Nominal discharge current In (8/20μs)5 kA | ||||
Connection mode | Wiring terminal | |||
Transmission rate Vs (bit/s) | 2M | |||
Insertion loss dB | ≤0.5 | |||
Housing material | Enhanced flame retardant nylon (light gray, flame retardancy degree: V0) | |||
Installation pattern | 35mm standard DIN rail installment | |||
Cross-section | ≥ 2 mm2 stranded/flexibleconductor | |||
Installation instruction
1. The SPD is connected in series between the signal channel andthe protected equipment.2. Connect the input terminal to the signalchannel, and the output terminal to the protected equipment.3.Connect the earthing wire of SPD to the equalizing ring of thesurge protection system.4. The SPD is needless for specialmaintenance. When it is suspicious of SPD fault in systemoperation, please dismantle SPD module and then check. If thesystem recovers normality, SPD has broken down and needsreplacement. During replacing SPD module, circuit will not be cutoff and be in normal working.Surge Diverter
ed.
Surge Diverter
an= 3 >Enclosure material and flame retardantresistance
Enhanced flame retardancy nylon degree: V0 | |||
Terminal wiring ability | ≥ 10 mm2 stranded/flexible | ||
Installment instruction
Series connection, connection at the input front side of protecteddevice.Connect the lightning earthing wire to the lightninggrounding network in the computer room, make sure the earthingreliable and the earthing line less than 0.5mFree maintenance, green light constant on indicate normal at48V, off indicate broken, and then dismantle the protector andcheck the input power status. If the input power is normal, theprotector is broken and need being replaced. If the signal isinaccessible, dismantle the product and check it again. If recoverafter dismantlement, the signal section is broken, the protectorshould be replaced immediately.
Surge Diverter
ciency4 experienced technicians can build 6-8 prefabhouses with dimension of 20 feet | |||
26 | transportation | container trunk | container with 12 meters can load 8 houses with thedimension of 20 feet,4 houses with the |
Product’s characteristics:
1. Beautiful appearance
2.with good thermal insulation
3.high wind resistance and seismic resistance
4.convenient disassembly and transportation
5.repeated use
Practical container living room
>steel structure design
nbsp;all-round service to customersFoshan Shengbeng Steel Structure Co.,Ltd. will cooperate sincerely with the customers and build better future under the principle of win-win cooperation.
If you are interested in the steel structure warehouse,psls feel free to contact with us. For more derail pls browse ourother websites:
http://www.prefab-steelstructure.com
http://www.sbshouses.com
http://chinaprefabhouse.en.made-in-china.com
Steel Structure Hotel
H-Steel Structure Housing(Australia Standard)
ortest period of time. Our prefabricated buildings are your bestchoice for a stable and attractive structure built in 10days!Tell us what you need and we will send you the perfectdesign that meets your specifications. Let us help you build yourdream!Modular home containers manufacturer
structure built in 10 days!Tell us what you need and wewill send you the perfect design that meets your specifications.Let us help you build your dream!Office prefabricated container supplier
rong>Good quality with reasonable price |
astm a310 stainless steel tube
tact informtaion:Productsphotos
Product package
Products in stock now
Cold rolled steel coil thin / thick


