Brand:JINPENG
MOQ:1
Quantity:30
Startup ofball mill
A. Check ifall connecting bolts are tightened before startup of ball mill, andif there is any loosening with all connected parts.
B. Check iflubrication of oil site meet requirements.
C. Check ifthere is anything around ball mill and sorting machine, which mayprevent the machines from running.
D. Startupsequence for devices of loop; start ball mill before sortingmachine, followed by ore feeding after normal running.
Stop ofgrinding loop:
If grindingloop stops running, stop ore feeder first. Then stop ball millafter the ores are processed inside the drum of ball mill. Take outthe screw axis of the sorting machine out of the sand surface. Stopthe sorting machine finally
Provide ore dressing experiment,process design and onsiteengineering service.
Welcome to visit our lab, design institute and factory!



