Office Supplies
industrial paint for floor
2016-11-15 04:13  Views:108
Price:Negotiable
Send Inquiry
the environmental protection,
the paint film plump;
excellent adhesion;
do not contain any organic solvent;

The construction technology:

 

  • The Lord agent and curing agent in uniform mixing ratio,stirring time about 3-5 minutes;
  • Before the construction, remove the loose ashes, and sand, oil,water and other fixtures of basic level surface
  • The mixed paint, should be used up within the prescribed time(2 hours) as far as possible, to avoid create waste,don’t dose toomuch.one time.
  • the gel paint can''t use;
  • Primer completely dry after appearing to construction midway orsurface coating;
  • When construction, if do not take care to contact with skin andeyes, shall be immediately rinse with water and see a circumstancethe doctor;
  • The construction temperature must be more than 5°C, relativehumidity must be less than 80%. Do not construct when thetemperature is low and the humidity is high;
  • When construction,don’t mixed with other coatings and organicsolvents mixed, in case metamorphism.

Besmear brushs area: 4-6 square meters/L.

 

Cleaning: immediately after use water cleaningtools.

 

Storage:

 

opened cans should always cover tightly. This product should bestored in a cool dry place 5-35 °C airtight seal.

storage time: 12 months in original packaging, production dateplease refer to the packaging barrels tags.

 

Contact Infomation
Send Inquiry
Company name:Hebei Chenyang Industry & Trade Group Co., Ltd.
Status:[Offline] [Send message] [Chat]
Business contact:unfilled(Mr.)
Telphone:
Area: East Asia-China(Mainland)
Address:NO.1 CHENYANG STREET XUSHUI COUNTY