the environmental protection,the paint film plump;
excellent adhesion;
do not contain any organic solvent;
The construction technology:
- The Lord agent and curing agent in uniform mixing ratio,stirring time about 3-5 minutes;
- Before the construction, remove the loose ashes, and sand, oil,water and other fixtures of basic level surface
- The mixed paint, should be used up within the prescribed time(2 hours) as far as possible, to avoid create waste,don’t dose toomuch.one time.
- the gel paint can''t use;
- Primer completely dry after appearing to construction midway orsurface coating;
- When construction, if do not take care to contact with skin andeyes, shall be immediately rinse with water and see a circumstancethe doctor;
- The construction temperature must be more than 5°C, relativehumidity must be less than 80%. Do not construct when thetemperature is low and the humidity is high;
- When construction,don’t mixed with other coatings and organicsolvents mixed, in case metamorphism.
Besmear brushs area: 4-6 square meters/L.
Cleaning: immediately after use water cleaningtools.
Storage:
opened cans should always cover tightly. This product should bestored in a cool dry place 5-35 °C airtight seal.
storage time: 12 months in original packaging, production dateplease refer to the packaging barrels tags.