Preformmold Description
HOT RUNNER SYSTEM
1. Less energy cost and low pressure.
2. Use imported heaters,like Germany HOTSET coiledheaters .
3. Cavity-to-cavity control system ensurenozzle temperature fluctuates within 1oC
4. Hot Runner Balance design ensures evenlyforce,uniform heating and identical preforms.
Mould material: P20,45#,S136,2316 etc
Cavity : Single/Multi
Runner: Hot/Cold
Design software : PROE,CAD,CAE,CAM
Plastic material:PP/PET
Mould life : 500,000 times to 2,000,000times
Delivery time: 40-50days
Specification depends on customer requirement.
We have advanced heat treatmentequipment,which assures the hardness of mould components (S136steel 50-52HRC,P20 Steel 35-38HRC).And the OPs have abundantprofessional experience and strict working flows.
According to customers request to build themould. Before make the mould, we send mould design to customerapproval first, before move forward top production, we send sampleto customer to confirm first.
Delivery goods by sea or by air, according bycustomer requirment.
Name | Description |
Mould material | 45#, P20, S136,3Cr13 etc. |
Mould base | LKM, HASCO etc |
Cavity | Single/multi |
Runner | Hot/cold |
Design software | PROE, CAD, CAM,CAE etc. |
Plastic material | PP, PE, PET etc. |
Mould life | 500,000-3,000,000 shots |
Delivery time | 15-60days |
Specification | Depends on customer''s requirements. |
Step
1.R&D | We support customer R&D. Make the files orimprove the design if you needed. |
↓ | |
2.Negotiation | the quality, price, material, delivery time,payment item, ect. |
↓ | |
3.Place an order | according your own design or you chooses ourdesign. |
↓ | |
4. Mould | According customers request to build the mould.Before make the mould, we send mould design to customer approvalfirst, before move forward to production; we send samples tocustomer to confirm first. |
↓ | |
5. Sample shoot | If the first sample come out is not satisfiedcustomer, we modify the mould and until meet customerssatisfactory. |
↓ | |
6.Products in store | If your quantity is beyond our storage, we willprovide lead time to you. |
↓ | |
7. Delivery | Delivery goods by sea or by air, accordingcustomers requirement. |


