Kitchen suction cups steel ball storage racksponge sheif
Description:
| Name | Plastic InjectionMould |
| Highlight: | Excellent in interchangeablecores molds design & making.Molds can be interchangeable onmolding machines |
| Mold Steel: | Buderus, Assab, AISI & JIS(including preharden steel and fully harden steel), P20 (=1.2311),H13 (=1.2344), Starvax 420 (=stainless steel) |
| Mold base: | Hasco standard, Europeanstandard, world standard |
| SurfaceFinish: | Texture (MT standard), highgloss polishing |
| Engraving: | Date stamps (year and month),logotype,etc |
| Mold sampling-Moldtrial: | Trial molding machine available: from 50~2500T |
| Cavity | 1~10 |
| Finish | Mirror finis, high grosspolishing |
| Runner system | Hot/Cold runner (MoldMaster,Incoe, Masterflow, LKM, Yudo system...etc) |
| Cycle time | Up to the workingenvironment |
Mould Design:
1) Plastic injection cover moulddesign is a brain demanding work which has no copyaction.
2) When designinginjection mould the method of modification should be takeninto consideration and should have enough space formodification.
3) The devices of thecover injection mould should meet the standard ofanti-grating and long-life shots.
4) The manufacturing skill andtime is different with the hardness and stretchiness of thematerial.
5) Because of its precision, mostof work has to be done by manual work.
6) Plastic injectioncover mould of high quality should be qualified with goodsurface manufacturing and precision
Remarks:
1.Rich experience inthe design and manufacturing of plastic injection mould.
2.High quality,competitive price, on time delivery and good servive.
3.Customers'' 2D, 3Ddrawing or samples are welcomed.
4.OEM & ODMorders are accepted
5.Our factoryalready passed the ISO 9001:2008 Certificated.
6.Three-eight-hour-shifts workingsystem, ensure the efficient production.
EquipmentList:
Machine | Quantity | How many years used |
Wire Cutting | 4 sets | 3 years |
High speed precision CNC | 3 sets | 3 years |
Normal precision CNC | 3 sets | 3 years |
Five axial CNC | 5 sets | 2 years |
Grinding machine | 8 sets | 3 year |
Normal crude CNC | 3 sets | 4 years |
Milling machine | 8 sets | 4 years |
Deep hole driller | 2 set | 2 years |
CNC engraving and milling machine | 2 sets | 2 years |
Laser repair welding machine | 1 set | 2 years |
Procedures:
1. Sample/Drawing | Detailed requirement will be needed |
2. Enginner Review | Material, cavity, Mould weight, give customers suggestion |
3. Make quotation | Sales department and RD department have meetings according to customers'' request |
4. Negotiation | Material, cavity, price, delivery time, payment term, etc. |
5. Place order | Depending on final/confirm/iation |
6. Mould design | We will exchange opinions with you during making drawing |
7. Tooling mould | After gettingcustomer approval, the mould will beproduced |
8. Mould process | Provide photos for customersto let you know the tooling procedures |
9. Sample /confirm/i | Samples will be sent to you, mould should be modified if samplesare not perfect |
10. Delivery mould | Arrange shipment after customers confirmingthe samples |
ProductionEquipments:
QualityControl:
Workplace:
ProductShow: