Brand:MASTER CLEAN
MOQ:500
Quantity:5
Send Inquiry
Brassfaucet SingleLever Extended Mono Basin Faucet| Brief Description: | 59%brass body,chrome plated finished,Zinc alloyhandle;Competitive price,shortly delivery time;5 years qualityguarantee,OEM/ODM service are available |
Key SpecificationProduct Features:
- Raw Material: 59% brass body(Composition: Cu>59%,Pb≤2.5%)
- Handle materials: Zinc handles
- Surface: Chrome plating, good performance, excellent platingsurface
- Ceramic Cartridge: 35mm Wanhai ceramic cartridge, 500,000 lifecycles without leakage
- Salt Spray Test: passed 24hours acid salt spraytesting(ASS)
- Accessories: 2 pcs of flexible hoses for hot and cold, 1 pc offittings pack
- Package: Cotton cloth bag or bubble bag with design inner box,meet the exports package standard
| Payment Terms | Western Union, D/P, D/A, L/C, T/T, Others |
|---|---|
| Minimum Order | 500 pcs |
| Lead Time / Delivery Time | 35 Day(s) |
| Sample Available | YES |
| Delivery Details | Deliver the goods to Ningbo port,or CIF |
| FOB Port | Ningbo |
| Loading Info | By sea form or by air Ningbo port, China |
| Packing Info | 1. Internal packing: Cotton cloth bag or bubble bag with designinner box. 2. External packing:Export carton,meet the exportpackage standard. |
| Target Market(s) | Africa, Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan &Korea, Latin America, Mainland China, Middle East, North America,Northern Europe, Oceania, South Asia, Southeast Asia, WesternEurope |
| In-process management procedures |
| 1.According to production requirements,logistics is resposiblefor establishing EHS requirements,rational layout of the productionenviroment,production department to maintain the productionaccording to 5S management requirements,to a special enviromentalin equipment or procedures,need to have a formal document specifythat the staff must strictly enforce,on the anti-staticrequirements of the process and location,must operate strictly inaccordance with the guidance document and the correspondingdocumentation for operation. |
| 2.Engineering resposible for equipment maintenance, specificmaintenance contents fefer to production equipment controlprocedures. |
| 3.Production resposible for assist materials control Departmentof the online materials,and manage scrap units. |
| 3.Production control production line output according toplans,use the "production internal maintenance form"record andtrack human,machines,materials and technics abnormity in produceprocess;quality control/Engineering Department make a patrolinspection on the production line to control the production processquality.According to the process and equipment characteristics,theproduction process will be devided into general process,keyprocess,and special process for different levels of control. |
| 4.1 General process control |
| 4.1.1 Before production,should confirm raw materialspreparation,equipment status,operation guide books,staffskills. |
| 4.1.2 Strictly operate in accordance with the guidancebooks,through the operator self-inspect,multi- inspect and QApatrol inspect for real-time monitoring quality. |
| 4.1.3 The feedback of fluctuate process:promote productionmanagement principles. |
| 4.1.4 The defective in prodction operate according to"Defective control procedue" |
| 4.1.5 Record and stat production status |
| 4.2 Key process control |
| According to product characteristics,the company confirm thefire detector calibration processes and functions of mobiledetector test processes for key processes. |
| 4.2.1 Pre-production with the test samples could confirmwhether the equipment used for the production and makerecords. |
| 4.2.2 Quality selective inspect of the fire detectorsensitivity to control the accuracy of calibration. |
| 4.3 Special process control |
| According to product characteristics,the company /confirm/iSMT,reflow solder,hands and wave soldering process for the specialprocess and the specific special control refer to "special processcontrol procedure". |
| 5.Production process should be operational by guide bookguide,operation guide book shall be in writing in pictures combineddescription code,and pay attention items and qualitystandards. |
| 6.Quality records requirement in the process should follow therelated contents of Record control procedure". |
| 7.After the end of production,after the inspection andacceptance by quality control,the packing storage,warehouse confirmquantities and arrange every lot intergated qualified products tomeet the quantities request of shipment orders.If the inventorywere stored for more than three months and need to ship,thematerials control department supply appliactions,after theproduction rework,the inspector re-inspect,and passinginspection,then shipment. |
Professional supervision Loading
Carton Fair we''ve attended
Company Certificates
Workshops review:
Company tenet:
With the mission of customers first,quality oriented,Ningbo MasterClean Commodities Co.,Ltd. pays special attention to technologyinnovation and quality stability,and offer best quality productsand services to customers and clients warmheartedly to satisfycustomers.


