Office Supplies
UHMWPE Composite Pipe
2016-11-13 05:24  Views:138
Price:Negotiable
MOQ:1
Send Inquiry

UHMWPE compositepipe
UHMWPE complex pipe is made of UHMWPE pipe and carbon steel pipeaccording to the scientific process. Its outer layer is the steelpipe with flange as the enhanced protective layer, and its innerlayer is UHMWPE pipe as the matrix pipe. The inner UHMWPE pipe isextended out of the outer layer of the matrix nozzle and cover theflange face into a whole structure, so we can combine UHMWPE pipeand carbon steel pipe to form the pipeline equipments with thefeatures of wear resistance, impact resistance, anti-corrosion,resistance to high pressure, self-lubrication, impact performanceabsorbing, anti-bonding. The pipeline equipments are widely used inthe transport of powder and coal ash in thermal power system,backwater pipelines, the transport of mine tailings and slurry inthe mining industry, the high-pressure transport of pulverized coaland coal-water slurry of coal preparation plant in the coalindustry, as well as the transport of mud and corrosive media withslag in other industries.
Features of UHMWPE CompositePipe Products
1. All the features of UHMWPE pipe
The medium is separated from the steel pipes, and it only touchwith UHMWPE pipe layer, so UHMWPE Complex Pipe holds all the uniquevirtues of UHMWPE pipe by the molecular structure of UHMWPE. Thesefeatures are high wear resistance, excellent chemical stability,good self-lubrication, non-toxicity to living things, the uniquelow temperature resistance, surface non-adhesion, etc, which extendthe service life of pipelines greatly.
2. Very high impact resistance
UHMWPE pipe itself has a very high impact resistance, and as astrengthening layer, the steel pipe adds to its ability of impact,pressure, bending and intensity. UHMWPE complex pipe can bear moreendurance and higher water pressure than the ordinary plastic pipe,and the water pressure can reach 6.4Mpa after test. UHMWPE complexpipe are not afraid of being knocked, and the lining does not breakdown, especially for some high-pressure transport pipelineequipment in the poor environment.
3. Recycling
Steel pipe needs only one-time investment. The old pipe can berepaired and lined UHMWPE layer and continued to use. Every timelined UHMWPE layer, its service time is equivalent to 4-5 times thelife of the metal pipe, so you can save money further.With CE, ISO9001, ISO14001 certificates, high qualityand competitive price.

 

Contact person: NeyesKwok                    

Tel: 86 379-65227502

Mp: 86 15036559071

Fax: 86 379-63900127

Skype: neyeskwok

Website:www.pipe-floater.com

Contact Infomation
Send Inquiry
Company name:Luoyang Jinhui Machinery & Electric Co., Ltd.
Status:[Offline] [Send message] [Chat]
Business contact:Neyes Kwok(Mr.)
Telphone:
Area: East Asia-China(Mainland)
Address:Floor 5, Binjiang Builiding, Jinguyuan Road No.72 Luoyang Henan 471000 China