MOQ:1
Data | Test Method | ||
Pull-off strength (with EPS board) | Original | ≥0.10Mpa (EPS damaged) |
JG 149 |
Water resistant | ≥0.10Mpa (EPS damaged) | ||
Freeze-thaw resistant | ≥0.10Mpa (EPS damaged) | ||
Flexibility property | Compressive strength/flexural % (cement base) |
≤3.0 | |
Cracking strain % (non cement base ) | ≥1.5 | ||
Processing/working time | 1.5~4.0 | ||
Substraterequirement
1) EPS board mustbe clean (no dust or dirt)
2) EPS boardmust be fixed stably (Wait min 24h before applying shunan.thermepsad
3) The surface of the wholeEPS wall must be level
Preparation
1)EPS board must be fixedstably
2) Polish the EPS board to make sure the whole EPS wall isflat
Applicationenviroment
1) Temperature:5°C~35°C
2) Avoidraining, high temperature and frost
3) Avoiddirect sunlight
Safety
1)May cause serious damage to eyes
2) May besensitive to skin in case of contact. lrritable for eyes,respiratory system and skin
3) Keep outof the reach of children
4) Avoidbreathing the dust
5) In caseof contact with eyes,rinse eyes immediately with plenty of waterand consult a doctor
- AdditionalInformation
| Payment Terms | L/C, T/T, Others |
| Minimum Order | 1 ton |
| Lead Time DeliveryTime | 3 days |
| Sample Available | Yes |
| FOB Port | Shanghai |
| Packing Info | in 25kg bags |
| Target Market(s) | Africa, Eastern Europe, Hong Kong/Macao/ Taiwan, Japan & Korea, Latin America, Mainland China, Middle East, North America, Northern Europe, Oceania, South Asia, SoutheastAsia, Western Europe |


