Brand:OEM
MOQ:500
Quantity:3
Aluminum flexible duct
1)standard length:10m
2) delivery time:15 Days
3) MOQ:500 (mixed size)
4)located at Shanghai,China
established at 2007,located at 169 Sanlu Rd,Minhang districtShanghai China,
Which is covers 3000 m2.
We specialized in Aluminumflexible ducting, our main products are Insulated flexible duct,PVCflexible aluminum duct,and acoustic flexible duct etc.we got 8production lines,and there have 32 employee worked in ourfactory.Such as North America, Europe,Mid East and Arica are ourmain market.We got at least 2 Million as our annual turnover,theexport was occupied 80% to 85%.
Quality is our top concern,which is asimportant as R&D.we do our best to help our customers in thesuperior position in their market.If you need such kind productswhy don't you try to contact us.
Aluminum flexible duct,pipe,hose
here you have three choice:
1)aluminum foils polyester aluminum foils
2)aluminum foils polyester
3)polyester aluminum polyester
4)aluminum black polyester
Advantages:
Low costs on transport and logistics
Easy to install over either round or oval ducting
No special tools required for cutting or fixing
In case of a fire no toxic gases are emitted
The products have been tested on fire resistance
aluminium flexible duct
| Separation according to density: In a poaching tank, remainingpolyolefin and floating glues are separated from thepolyester. | |
| Separation of the suds: The hot wash water with the detergentsin it is separated from the flakes. | |
| Treatment of the suds: The hot wash water is enriched with lyeand detergents. | |
| Clean rinsing: The clean flakes are rinsed in water in order toobtain a neutral pH value. | |
| Intensive washer and spraying washer: As an compliment toseparation tank to remove the suds from the flakes | |
| Retreatment of flakes | Mechanical dewatering: The flakes are dewatered with acentrifuge |
| Thermal dryer: The flakes are dried to the requiredresidual moisture with a thermal heater | |
| Cyclone silo: Separate the remaining light foreign materialswith blower and store the crystallized flakes | |
| Bag system: Store the flakes in bags for reuse | |
| Water Treatment | Water collection, screening: The dirty water is collected in apit and any contamination larger than appr. 0.1 mm is removed. |
| Sedimentation: The screened water is stored in a sedimentationbasin for the sedimentation of light contamination; the result iscirculation water. | |
| Storage: The mechanically treated circulation water isstored. | |
| Treatment of fines: In a chemical or physical water treatmentplant | |
| Reconveying into the plant: A pump conveys the circulationwater back into the plant. | |
| These functional units represent possible proceduresteps when PET bottles are recycled | |
| They are selected according to the frame parametersof the feed material and the desired final product when such aplant is designed. | |
| The single functional units are combined withconveying systems (belt conveyors, conveying screws, elevators,blowers, pumps) appropriate to the specific nature of the productand in relation to their location. Type and volume of the necessaryconveying systems are determined in respect to the project. | |
HDPE Bottle Washing Line >max.
| ONT-SIZE: 10pt >>p>r |




