Send Inquiry
1. High intensity: 1 day Compressive Strength ≥ 20
M pa, 3 days Compressive Strength ≥ 35 M pa
2. Excellent flow-ability: Initial Fluidity ≥ 270mm. Can
Fill the gap with width over 20mm. Dispel foam during
The grouting and reduce the gap.
3. Non-shrinkage: Close and full filling guarantees
The accuracy of installation. Improve the stability of structure and equipment. Prolong the life.
4. Excellent weather resistance: Anti-oil penetration, excellent frost thaw resistant.
6. High bonding strength: Bonding closely with base concrete and steel structure.



