Send Inquiry
Initial state----Put the material into the mould, reposit the ejector cylinber----Load the miuld----Close the mould quickly----Clamp the mould slowly, increase pressure----Exhaust/vulcanization start----Vulcanization finish----Open mould quickly----Pushing out the mould----Ejector cylinder works, and separate mould and product----Take out the product
2RT is official, and the mold device of 3RT and 4RT is optiona
| SPECIFICATION | ZDT1000-500×500 |
| Clamping force | 1000KN |
| Max.systempressure | 20MPa |
| Clamping stroke | 300mm |
| Rapid clamping speed | ≥60mm/s |
| Heating plate size | 480mm×500mm |
| Heating plate spaceing | 400mm |
| Max.temperature | 250°C |
| Motor power | 4KWX2 |
| Heating power | 9.6KWX2 |
| Extemal dimension | 3150mm×1800mm×2250mm |
| Weight | 7500Kg |
| Oil tank capacity | 290L |
| Ejector stroke | 250mm |
| Ejector force | 41KN |


