For paper control room: The operator will act according to the production task list, put the specification, quantity, machine group number of needing paper and so on parameter into computers; At working, when some machine groups wants the paper, according to papier-mache' request, the automatically arrived installing paper table installed paper, then drive to this machine group.
Want the paper line function: Various branches want the paper signal to line up according to the time order, according to principle which installs first with same papier-mache.
The web autoloading function: The Webs enters installs paper area, the empty vehicle automatic drives to installs paper parking lot when there are the branch wants paper. The webs rolls into the vehicle by turn over after the promotion, simultaneously the damping pole stretches out automatically, make the web load the vehicle steadily.
Loding paper automatic movement: The installing paper vehicle carrying on judgment to walk basis on the road section, the parking lot and the railway turnout position, until the wants paper branch entrance, the vehicle drive into this branch to stop after the system set the railway turnout into curve automatically.
The empty car return fuction: After the vehicle' paper loaded the printing machine, the operator press the button and puts it into the main line entrance, the system return to empty vehicle area automatically.
Demonstration of entire line running status: The system uses on the global mode show the parking lot, the route occupy position situation, the raiway turnout' position, various part of installing paper table of line, and whether there is web and so on.
Automatic gauge function: The vehicle load paper, start out and the rest paper returns are automatic gauge. The car stoped when car runed to weighbridge, the vehicle drives away the weigh bridge after measure datas introduced the computer. Each printing machine' paper quantity and the different variety total quantity are demonstrate on the monitor screen, and it can printout by the report form.
The breakdown warning and demonstration of entire line runing: The system can judge entire line' vehicle movement overtime does not to arrive, the railway turnout movement overtime does not arrive and so on the breakdowns, and auto-alarm. The control of system uses German Simens or ABB' products. With PLC, master control machine took the monitoring operating system, the main electric appliances part uses the import product.
2)Main Technical dates:
Way of conveying: Auto carriage vehicle runs circularly on a horizontal plane.
Loading system: Web auto load paper organization 30 seconds/time
The power of conveying vehicle: The direct-current accumulator cell power supply or exchanges 220V and the 36V low pressure power supply
Max loading capacity: <1, 200kg/vehicle
Vehicle speed: <24n/minute
Swerving semi-diameter: 1, 200mm



