Metallurgy, Mineral & Energy
elevator stamping parts
2016-11-01 00:14  Views:135
Price:Negotiable
Send Inquiry

Mold manufacturing process
1.Sample or Drawing by customer
2. Tooling Proposal & Discussion
3. 3D Tooling Design
4. Tooling Production
5.NC Programming
6. CNC&M/C machining and EDM Machining
7. Fitting& finish
8. Tooling Measurement & Check
9. Assembly
10. Trial Production
11. Correction
12. Final Trial
13. Samples Inspection
14. Samples Approval by customer
15. Tooling approval
 
Procedures/Testing Details
All products must be inspected with restrict regulations to carry on Six sigma on all products before final delivery:

All raw materials must be inspected by independent material testing institute before being used in the production.
QC inspections are performed at each stage of production.
Random inspections are also conducted every day.
A final inspection is conducted before delivery is authorized.

Contact Infomation
Send Inquiry
Company name:Ningbo Beilun Honghui Electrical Fittings Factory
Status:[Offline] [Send message] [Chat]
Business contact:Lucy Yu(Mr.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:No.36 Changsheng Road, Daqi Industrial Zone (Shiqiu), Beilun District