MOULD STEEL
1. cavity & core steel: DIN1.2316,made in Germany,HRC45-52
2. inserts & slides steel: H13(DIN1.2344), tempered with HRC42-55, Nitrited with HRC60-65, measure up to D-M-E metric standard
3. mould spare parts: H13 ( DIN1.2344), tempered with HRC40-45, Nitrited with HRC60-62, measure up to D-M-E metric standard
4. mould base: SC50#, made in China.
DELIVERY DAYS
It takes 7 days for 2D part drawing and 3D mould design, the first testing sample will be sent to the buyer within 45 days after 3D mould drawing was /confirm/ied, 60 days for shipment.
MOULD SERVICE
1.We will send weekly mould progress report and tooling schedule.
2.We will send the first testing sample for buyer's inspection and work out improvement requirements.
3. We will send the mould testing video, 2D part drawing and 3D mould design before shipment.
PAYMENT TERMS
50% deposit by T/T, the balance 50% will be paid before shipment
Chinaplas2013
20-23.5.2013
Weclome to SHINY TOOL & MOULG CO., LTD
Booth No: 4.2L01
China import and Export Fair Complex , Pazhou , Guangzhou, PR China




